Skip to main content
Client · In production

Reading and analysis of technical drawings

Precision manufacturing · Costa Rica · 2026 — present

ROLE: Design · Build · Implementation

  • VLM
  • RAG
  • pgvector
  • Voyage

Blind-validated

against the client's expert; passed the contractual acceptance gate

Apr 2026

SOURCE: golden validation vs SOW gate

The situation

The operational flow requires reviewing technical drawings at high volume before they reach production.

Each drawing contains details that, if missed, create plant-floor risks or cost overruns during fabrication.

The review depends on senior engineers and consumes significant time.

What I built

An AI system that operates on every drawing before it reaches production.

What happened

Before, they spent their time reviewing line by line. Now they apply judgment over material already pre-processed by the system — faster, with more coverage, and without burning senior capacity on low-value review.

The capacity and quality of this stage grow without adding more senior engineers.

Validation was blind, sample-by-sample, against the client’s own expert analyses.

Senior time now goes to judgment, not line-by-line checking.

Let's discuss scope